CLAIIM preview status
Self-hosted evaluation is the current access path. Production readiness and hosted SaaS work are ongoing. Source implementation status does not establish what is deployed in your environment; confirm your installed release before relying on a capability.
Integration coverage
| Path | Status | Assurance and prerequisites |
|---|---|---|
| Gate and SDK | Implemented in preview source | Evaluates submitted requests. ALLOW, DENY, and HOLD are decisions; direct execution can still bypass a gate-only integration. |
| Controlled HTTP gateway | Implemented in source; check your installed release | Enforces the controlled path only when the destination accepts only the gateway credential and the agent has no alternate route. Reported delivery is not independently verified downstream success. |
| Chron | Application audit record | Append-only through the application. Database administrators can alter records. Independent cryptographic verification remains in development. |
| Constrained MCP stdio proxy | Source implemented; release acceptance pending | Static tool mappings and approval resume are implemented in source, not confirmed publicly available. Coverage is limited to mapped calls through the controlled gateway and its credential prerequisites; pending calls are held in memory and lost on restart. |
| GitHub and CI/CD connectors | Planned integrations | Reference demonstrations do not establish released connector support. Each connector needs allowed, denied, held, and bypass acceptance evidence. |
| Local files, shell, separate credentials | Outside current coverage | Local agent activity and destination calls using credentials held separately by the agent are outside the controlled gateway boundary. |
Deployment readiness
- Evaluation preview: self-hosted, single-instance evaluation use.
- Professional and Sovereign: design-partner readiness tracks under development. Production acceptance, availability, identity federation, and air-gap delivery remain pending.
- Tenant isolation: conversion is in progress and has not completed acceptance certification.
- Hosted SaaS: future deployment capability; no production SaaS launch is announced here.
- Customer-held encryption keys: planned. Operator access depends on deployment permissions.
